TWISTED TOWER

Client:
Mr Khalil Rihan
Total Drilling Length:
18m
Location:
Libreville, Gabon
Nos. of Piles:
159
Diameter:
880/780mm & 1180/1060mm
Max. Pile Length:
14m

As a specialized subcontractor, under the main contract between Mr. BCC Company and PFS Company, PFS’ tasks were covering the following activities:

  • Drilling of 71 foundation piles, with 880/780mm diameter into hard Rock with 14m depth
  • Drilling of 88 foundation piles, with 1180/1060mm diameter into hard Rock with 18m depth
  • Fabrication and installation of steel cage
  • Concreting

The project consists the construction of the twisted tower project with 33

floors. Under the main contract between PFS and Mr Khalil Rihan, PFS was nominated as a specialized subcontractor to execute the deep foundation works. Due to the subsurface conditions, PFS has installed a total of 159 foundation piles. Piles were designed to work on skin friction and End-Bearing.

Equipment :

Piles Drilling Rigs: Bauer BG15

Oscillator: BV1180

Mobile Cranes: PPM 40T

Related Projects

MIXED USE

For the construction of two (2) new buildings in Bonanjo consisting of 17 and 19 floors, including 2 connected underground parkings, the main contractor “Les

DJEUGA PALACE

Due to design calculation problems and over estimation of the soil capacity under the 13 floors hotel, huge settlement under the raft have affected the

Got a project in mind? Don’t Hesitate call us today!