Total Drilling Length:
7m
Location:
Libreville, Gabon
Nos. of Piles:
33
Diameter:
880/780mm
Max. Pile Length:
7m

The project consists the construction of residential Building. Under the main contract between PFS and Ste BTSG_TP, PFS was nominated as a specialized subcontractor to execute the deep foundation works. Due to the subsurface conditions, PFS has installed a total of 33 foundation piles with 880/780mm Dia. Piles were designed to work on skin friction and End-Bearing.

Related Projects

MIXED USE

For the construction of two (2) new buildings in Bonanjo consisting of 17 and 19 floors, including 2 connected underground parkings, the main contractor “Les

DJEUGA PALACE

Due to design calculation problems and over estimation of the soil capacity under the 13 floors hotel, huge settlement under the raft have affected the