Logo #0066_no_background_1

ORIGAMI

Client:
Monet
Total Drilling Length:
1288m
Location:
Douala, Cameroon
Nos. of Piles:
92
Diameter:
600mm
Max. Pile Length:
14m

For the construction of a new building in Bonapriso consisting of 15 floors and 2 underground parkings, the Client “Monet” have employed Progress for Design and Built of the shoring system.

The design proposed by Progress was based on 92 spaced pile wall of 60cm Dia. and 1.7m spacing center to center with 14m depth, supported by a layer of prestressed ground anchors reaching 22.5m length and covered by a layer of semi-smooth shotcrete.

The exposed excavation depth is 9.5m.

Monitoring of shoring system was done by 2 to 3 inclinometers installed in each section (11 nos total).

Equipment :

Mobile Cranes:

  • Tadano 30T

Micropiles drilling rigs:

  • 2 BAUER UBW08

Mixing and desanding plant:

  • Pumps (HP for slurry return, KP60 for grout injection, Mission Pumps for flushing during drilling)
  • ZM1 mixer
  • 2 Agitators
  • Solimec disander 140

Related Projects

MIXED USE

For the construction of two (2) new buildings in Bonanjo consisting of 17 and 19 floors, including 2 connected underground parkings, the main contractor “Les

DJEUGA PALACE

Due to design calculation problems and over estimation of the soil capacity under the 13 floors hotel, huge settlement under the raft have affected the