NOVIA Foundation Piles

Client:
NOVIA Industries
Total Drilling Length:
8750m
Location:
Bonaberi, Douala - Cameroon
Nos. of Piles:
350
Diameter:
1180/1060mm
Max. Pile Length:
25m

In order to extend the existing factory and build a new storage area, NOVIA Industries have awarded the construction of 350 Nos. foundation piles to Progress Foundation Specialists (PFS) Due to the soil conditions in the area and the elevation of the hard stratum, the foundation piles were working as skin friction piles. Special measures to prevent the negative skin frictions caused by the fill material between platform level and 5m depth were put in Place. Further, in order to verify the design assumptions, pile load tests were performed on some working piles.

Related Projects

MIXED USE

For the construction of two (2) new buildings in Bonanjo consisting of 17 and 19 floors, including 2 connected underground parkings, the main contractor “Les

DJEUGA PALACE

Due to design calculation problems and over estimation of the soil capacity under the 13 floors hotel, huge settlement under the raft have affected the

Got a project in mind? Don’t Hesitate call us today!