MIXED USE

Client:
SCI de Saligny
Total Drilling Length:
12.5m
Location:
Bonjanjo, Cameroon
Nos. of Piles:
0
Diameter:
600/500mm
Max. Pile Length:
12.5m

For the construction of two (2) new buildings in Bonanjo consisting of 17 and 19 floors, including 2 connected underground parkings, the main contractor “Les Batisseurs Reunis” and the client “SCI De Saligny” have employed PFS for Design and Built of the shoring system.

The design proposed by Progress was based on 154 spaced pile wall of 600/500 mm Dia. and 2.25m spacing center to center with 12.5m depth, supported by a layer of prestressed ground anchors reaching 19m length and covered by a layer of semi-smooth shotcrete.

The exposed excavation depth is 8.5m from top of cap beam.

After execution of the piles and exposing 2.5m, 3 suitability test on anchors were performed to verify the geotechnical capacity of the soil and its conformity with the soil report.

Related Projects

DJEUGA PALACE

Due to design calculation problems and over estimation of the soil capacity under the 13 floors hotel, huge settlement under the raft have affected the

MALL

The project consists the construction of mall. Under the main contract between PFS and Mr Nader Hachem, PFS was nominated as a specialized subcontractor to

Got a project in mind? Don’t Hesitate call us today!