The project consists of the construction of a new factory for MIMOSA. PFS was contracted to execute the deep foundation works. Due to the subsurface conditions, PFS has installed a total of 205 foundation piles, divided into 95 piles with 1180/1060 mm Dia., and 110 piles with 880/780mm Dia. Piles were designed to work on skin friction, down to a maximum depth of 47m for the 1180/1060 mm Dia. Piles and 40m for the 880/780mm Dia. Piles.

MIXED USE
For the construction of two (2) new buildings in Bonanjo consisting of 17 and 19 floors, including 2 connected underground parkings, the main contractor “Les