The project consists the construction of mall. Under the main contract between PFS and Mr Nader Hachem, PFS was nominated as a specialized subcontractor to execute the deep foundation works. Due to the subsurface conditions, PFS has installed a total of 69 foundation piles with 620/540mm Dia. Piles were designed to work on skin friction and End-Bearing.

MIXED USE
For the construction of two (2) new buildings in Bonanjo consisting of 17 and 19 floors, including 2 connected underground parkings, the main contractor “Les