BODEGA

Client:
BCC Company
Total Drilling Length:
14.5m
Location:
Libreville, Gabon
Nos. of Piles:
71
Diameter:
880/780mm & 650/560mm
Max. Pile Length:
13.5m

The project consists the construction of offices. Under the main contract between PFS and BCC Company, PFS was nominated as a specialized subcontractor to execute the deep foundation works. Due to the subsurface conditions, PFS has installed a total of 71 foundation piles. Piles were designed to work on skin friction and End-Bearing.

As a specialized subcontractor, under the main contract between Mr. BCC Company and PFS Company, PFS’ tasks were covering the following activities:

  • Drilling of 33 foundation piles, with 880/780mm diameter into hard Rock with 14.5m depth
  • Drilling of 38 foundation piles, with 650/560mm diameter into hard Rock with 13.5 m depth
  • Fabrication and installation of steel cage
  • Concreting

Equipment :

Piles Drilling Rigs: Bauer BG15

Oscillator: BV1180

Mobile Cranes: PPM 40T

Related Projects

MIXED USE

For the construction of two (2) new buildings in Bonanjo consisting of 17 and 19 floors, including 2 connected underground parkings, the main contractor “Les

DJEUGA PALACE

Due to design calculation problems and over estimation of the soil capacity under the 13 floors hotel, huge settlement under the raft have affected the

Got a project in mind? Don’t Hesitate call us today!