Total Drilling Length:
4464m
Location:
Douala port, Cameroon
Nos. of Piles:
94
Diameter:
1180/1060mm
Max. Pile Length:
47m

The project consists of the construction of a new factory for MIMOSA. PFS was contracted to execute the deep foundation works. Due to the subsurface conditions, PFS has installed a total of 205 foundation piles, divided into 95 piles with 1180/1060 mm Dia., and 110 piles with 880/780mm Dia. Piles were designed to work on skin friction, down to a maximum depth of 47m for the 1180/1060 mm Dia. Piles and 40m for the 880/780mm Dia. Piles.

Related Projects

MIXED USE

For the construction of two (2) new buildings in Bonanjo consisting of 17 and 19 floors, including 2 connected underground parkings, the main contractor “Les

DJEUGA PALACE

Due to design calculation problems and over estimation of the soil capacity under the 13 floors hotel, huge settlement under the raft have affected the