ETAS MAJOR

Client:
Ste BTSG_TP
Total Drilling Length:
12m
Location:
Libreville, Gabon
Nos. of Piles:
64
Diameter:
880/780mm
Max. Pile Length:
12m

As a specialized subcontractor, under the main contract between Mr. Mohamad Reslan and PFS Company, PFS’ tasks were covering the following activities:

  • Drilling of 64 foundation piles, with 880/780mm diameter into hard Rock with 12m depth
  • Fabrication and installation of steel cage
  • Concreting

The project consists the construction of Etas Major. Under the main contract between PFS and Ste BTSG_TP, PFS was nominated as a specialized subcontractor to execute the deep foundation works. Due to the subsurface conditions, PFS has installed a total of 64 foundation piles with 880/780mm Dia. Piles were designed to work on skin friction and End-Bearing.

Related Projects

MIXED USE

For the construction of two (2) new buildings in Bonanjo consisting of 17 and 19 floors, including 2 connected underground parkings, the main contractor “Les

DJEUGA PALACE

Due to design calculation problems and over estimation of the soil capacity under the 13 floors hotel, huge settlement under the raft have affected the