Client:
SCI MILLENIUM
Total Drilling Length:
14m
Location:
Libreville, Gabon
Nos. of Piles:
161
Diameter:
1180/1060mm
Max. Pile Length:
14m

The project consists of the construction 3 new Towers of 15 Floors each. Under the main contract between PFS and SCI Millenium, PFS was nominated as a specialized subcontractor to execute the deep foundation works. Due to the subsurface conditions, PFS has installed a total of 238 foundation piles. Piles were designed to work on skin friction and End-Bearing.

Related Projects

MIXED USE

For the construction of two (2) new buildings in Bonanjo consisting of 17 and 19 floors, including 2 connected underground parkings, the main contractor “Les

DJEUGA PALACE

Due to design calculation problems and over estimation of the soil capacity under the 13 floors hotel, huge settlement under the raft have affected the