NOVIA Jet Grout

Client:
NOVIA Industries
Total Drilling Length:
4428m
Location:
Bonaberi, Douala - Cameroon
Nos. of Piles:
415
Diameter:
1200mm
Max. Pile Length:
24m

Due to the huge settlement under the raft holding 4 storage silos, and since the structure already existed, NOVIA Industries have employed PFS to execute the corrective measures under the structure. Considering the subsurface conditions, the concept and design of the rehabilitation works were done, based on the execution of jet-grouting columns to support the structure and limit the settlement. PFS has then employed 2 rigs, type KLEMM, to construct 415 jet-grouting columns, reaching a depth of 24m, inside 4 existing storage silos.

Related Projects

MIXED USE

For the construction of two (2) new buildings in Bonanjo consisting of 17 and 19 floors, including 2 connected underground parkings, the main contractor “Les

DJEUGA PALACE

Due to design calculation problems and over estimation of the soil capacity under the 13 floors hotel, huge settlement under the raft have affected the